Showing posts with label Laminate flooring. Show all posts
Showing posts with label Laminate flooring. Show all posts

Saturday, February 5, 2011

Talk about contagious...

Thanks to Denise over at The Bungalow Chronicles, I too have caught the posting bug and have decided to at least give a 2010 roundup...because looking back, though much was NOT accomplished or was only partially finished, well, we got a decent amount done...so, here goes nothing...

First of all, an unnumbered "accomplishment" was the successful birth of our second baby boy in October. He's a BEAST of a boy...was already 16 pounds and super tall at two months old. I might have to shore up the floor joists. ;) He's been great, has been healthy and is a happy, easy-going little guy. His older brother is fast approaching his third birthday already and loves his little brother a ton. So we're thrilled at that...

1. Finally, FINALLY, laid the floor in the basement...laminate over padding over Platon. The final steps to the basement refinishing, however -- the baseboards, chair rail and crown, as well as the final outlets above the crowns (for rope lighting) -- remain unfinished. That's because of No. 2...

2. Dealt with a serious sewer backup into the basement -- floor performed as I hoped, with the Platon keeping the water away from the floor itself...however, had the baseboards been in, the water would have come up on the floor. This sewer backup seriously hurt my motivation to get the trim work done.

3. Also hurting the overall project work around here was the bill for installing a sewer cleanout in front of the house -- to attempt to prevent future sewer backups by getting the line power-rodded every year. That wasn't cheap...but it's done AND the city replaced several feet of sewer pipe out in the street that had become misaligned and broken.

4. Much, much progress in the backyard in 2010. I tore down the entire east privacy fence, which was falling down anyway.

5. Built a half-raised (to level with the neighbor's yard) bed in the back and planted five shrubs that will provide somewhat of a privacy screen, be attractive AND provide food and shelter for the birds. All key factors I wanted from these shrubs...now, hopefully they'll grow as expected and not get really, really wide. :)

6. Modified and improved my four raised veggie beds in the back and installed patio pavers around all four, making it way more presentable and lifting the pathways to above flood stage. I still have some minor alterations/additions I need to make, but for the most part, it looks good back there.

7. Tore out the broken hot tub and tore down the "carport" providing shelter for it -- the yard looks about a thousand times bigger. I used College Hunks Hauling Junk to take away all the demo debris...they were AWESOME and I would recommend them, for sure.

8. Finally, in the very late (but warm) fall, I built a chain-link fence in the east gangway to replace the freestanding privacy fence that, again, was falling down. The last entry on this blog shows the first post going in. Well, I busted my butt working by floodlight at night even to get the fence up, and I only got some help from my buddy Luis, digging the post holes and sinking some of the posts. The rest I did myself, and it wasn't too bad, I'd have to say.

Maybe, if I can hold up this motivation, I will post a "2011 hopes" entry soon...until then, stick with me! :)

Sunday, February 7, 2010

The pain of DIY work...

I was going to not take the pic and/or share it until I was completely done because I didn't want to give away the big reveal yet, but I had to. I worked too hard and killed myself too much to not. Anyway, here's the basement family room at this stage. You can now see the paint scheme/colors (more or less), and here's the floor, with the main portion of the room finished. This space is about 30 by 12 feet. I did all of this MYSELF -- a little more than half the room on Saturday alone...(from just right of the outlets on the far wall to the left edge of the floor. I was a machine.

Laminate flooring is "easy" but it isn't as easy as they say...it takes a lot out of you. I'm not a marathon runner or weightlifter, but I'm not terribly out of shape. There's a lot of pushing, pulling and the like, and it KILLS your knees and back (even with kneeling on a foam pad). I was dead-tired today and still sore a bit...thankfully, I was able to sit down and watch the Super Bowl and do mostly nothing else.

There's another picture on my Flickr site of the "layers" of subfloor too, if you're interested. It's Tarkett Heartland laminate (I believe it's discontinued...bought it at Menard's more than a year ago, because it was something like 79 cents a square foot and came with a 25-year warranty!) on top of a vapor barrier-enhanced pad (DuoFoam with Self Seal), which is on top of Platon (www.systemplaton.com, if you don't know what it is). The Platon is placed on top of landscape fabric, per recommendations on the package (for sound dampening against the concrete floor, I believe).

I still have to finish the "wing" off to the left, but that's a much smaller room (13 by 10, or so, I believe), and then I have to cut smaller floor pieces to fill in the gaps near the walls (such as the one in the lower left). I should be able to knock out most, if not all, of this in the next week -- assuming all goes OK.

So, enjoy the sneak preview of the family room...once we get it all settled, I'll take another pic...there are a few other cool things we have up our so-called sleeves. :)