Showing posts with label Deep Thoughts. Show all posts
Showing posts with label Deep Thoughts. Show all posts

Sunday, January 15, 2012

It begins ...

As mentioned in my previous post, we've finally replaced the bathroom skylight with roof. Finally, there will be no more leaks.

Anyway, to save money on the final bill from the carpenter, I decided I would finish the interior of the project myself (insulate and drywall), mostly because we've decide to us this as an excuse to partially remodel the bathroom.

What's staying: The floor, the toilet, the shower and the shower surround. Also staying: the linen cabinet behind the door.

What's going: The sink faucets, the counter top.

What's changing:
-- Because we're afraid that a 60-inch vanity won't make it up the stairs of our fine Chicago bungalow (we've had trouble with getting the furniture we wanted for upstairs because of the narrow, steep staircase), and there's really nothing wrong with the vanity at the end of the day, we've decided to sand it down and stain it to our liking, along with the matching linen cabinet. We were going to get two separate, smaller vanities, but I checked and found that the floor tile was not run all the way under the current vanity. So if we had gone that route, we'd have had to redo the floor entirely.
--Currently, there are four recessed can lights in the bathroom. They provide plenty of light, but not the kind conducive to shaving or showering or things like that. I hate them and want them out. I'd like to have a more traditional, center-of-the-room light that illuminates the entire room, and then sconce-type lights by the new mirror/medicine cabinets.
--We're definitely getting a new vanity top and new faucets, so we're psyched about that. We might even be able to use both sinks!

What we're "afraid" of:
--Well, I'm nervous about the water pressure. When we changed out the shower head and toilet up in this bathroom, it solved the water pressure issues in those two areas. I'm hoping the same thing will happen here. If not, we will have to have a plumber come out and figure out how to fix the situation.
--We're not sure how the refinishing of the cabinets will go. Hopefully, it will be no problem at all, and that will save us some real money when all is said and done.
--Hopefully we can get the vanity top off the current vanity without any damage. Otherwise, it's square one for the vanity.

So, here's hoping I can keep up and give you all some great updates, with construction now getting back on track here at the bungalow!

Friday, May 20, 2011

Probably a little fear...

All of a sudden, I feel as though I know everything I want in the rest of the backyard. I can almost envision it.

Problem is, I'm afraid to start any of it, mostly because, it's no longer a "bang one thing out and move to the next" kind of project -- everything has to be planned for and tied together, or it will look patchwork. Problem with THAT is, there's no money to be had for such a monumental project, especially with the garage roof needing replacement and the skylight upstairs needing to be removed and roofed over. Those two things will cost some dough, and they're definitely not DIY projects, particularly for this DIYer.

Right now, there's still a sand/soil pit where the hot tub used to be, surrounded by bricks and concrete slabs...I want to reuse the slabs as a patio in some portion of the yard...then replant the pit with grass (I'd love to turn it into a garden, but with two little boys growing up quickly, they're going to need a serious play area in the backyard -- like *I* had growing up).

I also want to set up and plant a long thin garden along the west fence, in part to eliminate the grass up against the fence, allowing me to not have to get out the trimmer when I cut the grass, at least there, anyway. But this garden can't be too wide, for the reasons mentioned above.

Then, we have the boys' swing set to put somewhere. I wanted to landscape around it with mulch (or rubber mulch, or whatever), raised up a bit too -- not really for safety (we didn't have that in our yard, and we were fine), but more to give it a feel that it belongs there, as part of the overall landscape back there.

On top of this, the deck really is going to need to be redone in the next couple years, I think...and part of me wants to just do it now, but expand it to the west, along the entire back of the house. This, of course, is where the "no money for that" problem really arises.

So I guess one of these days, I will go out and start measuring, and then maybe sketch out a plan...maybe I can do everything with the exception of the deck, but incorporate it into the design for future inclusion. Who knows? Again, it's not like other things around this house don't need to be finished/started/fixed.

Monday, March 8, 2010

Curses, foiled again...

The point of this blog, other than to share with all of you my successes and failures, is/was in order to also provide a fail-safe way of cataloging for myself everything I'd done, to learn from failures and reap the benefits of success over and over again.

Of course, fail-safe proves to be a failure in this case!

I've been hunting all over the house for the seed packets for the veggies I bought and grew last year, specifically the broccoli and carrots. They were so tasty and very successful, I wanted to buy that variety again. Haven't found them yet (I swear they're here somewhere), but I thought maybe I'd mentioned the varieties here -- of course not. DANG!

Ah well...as you can tell, I've got the itch to get the garden plans going -- especially since I got a huge 30-pound load of processed poultry manure fertilizer pellets that supposedly will make my veggies ROCK this year (even more so than last year)! Since I got this for free (a random job perk, believe it or not), they have no reason to sell me on the effectiveness. We'll see how it goes, of course... :)

Anyway, I gotta figure out the varieties of carrots and broccoli...where did I put those packets!? :)

Friday, January 29, 2010

Hit the deck...well, it's concrete, so be careful...

As promised, here's what up with the basement floor...

So, we have your standard concrete slab floor. The nice thing is, it's pretty even. It's mostly level, not perfect, but there are no major mounds or valleys that would cause a problem with laying laminate.

To update, I did not want tile flooring. It was going to be expensive to cover the entire floor in the family room regardless of what we went with, and tile just was OUT of the question. Too much work, too much money and too cold a result.

So I wanted laminate wood-pattern flooring. But I was worried about water seeping under the floor and ruining it from underneath. So I decided to go with a product many of you might know about: Platon. It's used on foundation walls, but is also recommended as a waterproof underlayment for floors. It creates an air pocket between the floor and the concrete, which also helps insulate the floor somewhat too. I wanted this in case the drain (now UNDER the floor) backed up again. My thought being, if it backs up a little bit (like last time...it wasn't much and it was clean rainwater from the pit in the backyard), it will spread out underneath the floor, eventually drain back out and eventually dry (the floor "breathes" around the edges beneath the baseboards). Mold should not grow because there is no "food" underneath, and the Platon is sealed together. Yes, if the drain backed up really badly, the water would eventually overwhelm the space under the floor and overflow into the walls and onto the floor, but if that happens, I figure I've got a lot of other issues to worry about...by then the whole basement will be done for anyway.

On top of the Platon, according to manufacturer's instructions, goes the pad and the laminate right on top of that. Right now, I have to do half the basement at a time (because we have furniture already), so I have the Platon laid and sealed on the largest part of the basement, and the padding spread across about half of that area. Tomorrow I expect I'll start laying the laminate. I'm excited, as I just bought a table saw for the project -- so I'll get to open that and "play" and also get this project even closer to done. My goal is to get the floor down before the Super Bowl...it's going to be tight, but I think if I can knock out a major portion of it tomorrow, I'll be OK. The remainder of it is a much smaller section, and even better, is mostly a straight square (whereas this part of the room has a few jogs in the wall that I'll have to cut around).

Pictures when I'm finished...no fair peeking! :)

Tuesday, January 26, 2010

Is it 2010 yet...


house decor 2009
Originally uploaded by southsideandy
Here's what the bungalow looked like all decked out this year. We actually expanded our decorations to the lawn and the yew bushes, special thanks to our getting our pre-lit tree 75% off the previous Dec. 26 at Target. So we had extra lights, which we then traded in at Home Depot for LEDs (during their trade-in coupon deal prior to Christmas).

Now, I'm obviously way behind, so here goes nothing ...

2009 is in the rear-view mirror, and we're none the worse for it here at Building a Better Bungalow. Sure, there are folks out there who fared far, far worse than we did -- hell, we both kept our jobs, even though I took a tremendous pay cut and tremendous staff cuts all around me. Basically, the old adage: more work, less pay.

That led to far less time to work on the house, as did A.J.'s rapid growing up. We are preparing for birthday No. 2 -- suffice to say, the attention and love we've given him along with everyone else around him has paid off. He can recognize every single capital letter of the alphabet, can now mostly count to 12 (though he doesn't know what "counting" is...) and can "sing" a couple songs, such as a few lines from "Frosty the Snowman" and most of "Baa, Baa Black Sheep." He's a great communicator for his age...of course, with all this attention being given him, he's only now finally learning how to even consider playing or "reading" a book by himself. Either way, I love him, of course. But he has obviously taken up tons of my time (and that's a good thing, of course).

Since my last post in September, I'm not sure what I can say has gone on around here. We've fixed some things, decorated the house big-time for Christmas (as you can see). But really, there wasn't much "bungalow-related" action around here for a while. My garden indeed was a hit. I actually was able to harvest some broccoli ON THANKSGIVING and cook it up instantly for our families. It wasn't much, but as many of you know, there's nothing that beats fresh-picked produce.

Since December, though, things have been picking up. We got the family room to the point of being drywalled for A.J.'s party last March, but then work fell silent down there for quite a while. Well, aside from a few touchups, painting is finally DONE, finished a couple weeks ago. That allowed me to move on to more fun tasks, such as laying the floor...I've been waiting for this for a while. I'll post more on my progress and step-by-steps in a future post...

Once I get the floor in, we'll be ready for trim work and final electricals...we already have the TV, sectional and most of the furniture we need...so after that, we're done. That will be a great, great day!

We recently also bought new dining room table and chairs, mission style from Broyhill. They look much, much better than Gina's iron-and-glass set, in the sense of they fit the room and style much more. We're fighting through getting bedroom furniture -- but that too is another story for another day. Suffice to say, the Chicago Bungalow's staircase has foiled us once again.

I got a seed catalog in the mail the other day, and that got me itching to put in an order...I'm excited to get the veggies going again, building off what I learned last year. I also planted a TON of tulip bulbs in the backyard, and I'm hoping to see the fruits of that labor in the spring. Then, of course, there are plenty of flowers and perennials to deal with.

Lastly, I'm hoping against hope that the relatively dry winter we've had (relatively) continues. One of the main projects this year will (MUST) be to basically blow up the backyard and "start over" -- ripping down the hot tub and "carport" over it, and filling in the areas adjacent to the alley to prevent flooding of the yard backing up into the house. I cannot and will not jeopardize the work and money we've put into the basement because the city thought the alley should sit 8 inches above our yard decades ago. Too much at stake.

So, anyway, I leave you with that, for now...as things move along well into 2010, I wish you well and look forward to actually having projects, photos and stories to talk about again -- thanks for sticking with me! :)

Tuesday, September 29, 2009

Just insane...

Well, hey there everybody...anybody who I've disappointed, no doubt, over the past two months with my lack of blogging. I'm a journalist for a living, so you'd think, you know, I'd have plenty to say and report on around here and all, but it's been just crazy.

An 18-month-old son will do that...along with a crappy economy that just affects everything you had planned to do. And then add in the need to still be social, do things and somehow keep up with the household chores and stuff, and well, you know how it goes.

So, in bullet form, here are some updates since last I spoke:

1. Garden
The vegetable garden in the back was pretty much a smashing success. But I learned a few things.
--(a) 9 cherry tomato plants and 9 Big Boy tomato plants is too many tomatoes. And don't tell me about making sauce and ketchup and all that. I tried making sauce one evening, and it took me all evening. I simply don't have the time to do that, sadly, nor the canning ability to can tomatoes either. Not at this stage. Fortunately, I made a lot of friends and family members happy with the "free" tomatoes. :) After really struggling to start the year, over the past two months, I've pulled probably 1-2 dozen cherry tomatoes off every 1-2 days. The Big Boys took forever to grow and ripen, but I'm getting maybe three per 1-2 days now. They bounced back. But, it's very much a jungle back there.
--(b) Broccoli does much better when given sunlight. In Bolingbrook, I grew it in dappled sunlight, and it did well, I thought. But now, much better. I've cut main heads that were larger than my fist a few times already. Only thing is, I planted too late, as what I'm cutting was supposed to be my spring crop. It just now is producing.
--(c) The soaker hose hooked up to the rain barrel has made a huge difference, but I'm tired of stepping over it. Next year, I'm going to look into a less "in-the-way" option...copper tubing, maybe. We'll see...
--(d) Knock on wood, for some reason, I had NO critter invasions. I hope that lasts. I know I'm lucky. :)
--(e) Grapes need a lot more room to spread out. Sometime in the last two months, a windstorm blew over my top-heavy arbor loaded with grapevines. The grapes were doing OK, but it wasn't going to work. I cut the vines down, removed the arbor, and planted some new perennials. You can go over to my Flickr account to see the result. I'm hoping next year they'll come back as strong as the others have.
--(f) Two years in a row proves you can control Butterfly Bush and get it to grow 7-8 feet tall in a narrow space, with the use of a tall tomato cage and pre-emptive "training" of branches to stay in the cage and grow upward rather than outward.
--(g) Garlic takes a long, long time to grow. Still waiting on my garlic.
--(h) NOTHING beats carrots right out of the garden. Nothing.

2. Family room
Well, this is the project that has suffered from the economic downturn. It's been pretty much static since early to mid summer. Until recently, when we bought a nice sectional from Ashley Furniture, finally paid off the floor (which has yet to be installed) and turned around and purchased the subfloor materials. We still need to do a decent amount of painting/priming, install the floor and the trim. But we do have cable down there now, and like I said, we'll be getting a comfy sectional, so there might just be motivation to get this thing done already. Stay tuned.

3. Other projects/happenings
Outside of those two things, really, there hasn't been any major goings-on at the house. My parents just had their house (a pre-bungalow bungalow, if that makes sense) exterior walls repointed, washed and the brick walls on the roof (they have a flat roof) completely rebuilt, and for cheap. So, if my dad gives me the contact info, I might give this company a call and get them out to repoint the facebrick on my bungalow. I was going to do it myself, but if these guys are as good as the work they did on my parents' house suggests, I'd be comfortable with it. But we'll see. The only other thing I'd like to do/have to do, is to weatherstrip/proof the windows and some of the doors. Gotta do that before it gets too cold...but time's ticking away.

Ah well...I hope I still have some readers left! Thanks for sticking around and checking back...I'll try to be better, I promise!

Thursday, April 16, 2009

Oh, the humanity...OK, that's a bit overly dramatic...


halfway 1
Originally uploaded by southsideandy
Well, hey there loyal readers...Wow, almost a whole month of no posting by me. That's a record that I'm sorry to admit to for this blog (I think).

Basically, I've been way the heck too busy to post of late. Much has happened, though, in the last week or two, so I thought I'd share some photos and an update. It's long overdue.

1. The basement family room has been mostly primed and is just about ready for paint. The review of the Behr New Drywall Primer is that I really liked it. I put one coat of the primer on the ceiling, and my buddy Luis (who has made appearances on this blog in the past) put on one coat of Behr White Ceiling Paint, and other than probably a touch-up here and there, that's ALL the ceiling needed. Primer on the walls was a little thinner, but it looks like it's covering enough to put paint up. So that will be the next step.

I've decided I'm going with two-tone walls. Top half will be a color called Harvest Brown (710D-4) and the bottom half will be a color called Smokey Blue (540F-5). I got the color combo off the Yellow-Toned Neutrals Style Card, actually. Even though in the style card, the Smokey Blue is only the napkins in the photo. I think this will look really nice, and I like the fact that I'm adding some color, not just beiges and yellows and browns and whatnot. I'm gonna split these with a white (or ivory, we'll see) chair rail, which will run perfectly below the windowsills and perfectly above the fireplace to form the top part of the simple mantel.

Of course, I bought the primer and paint on Tuesday, and Home Depot decided to have a $5 rebate per can offer that started today. Bunch of jerks. I wish I would have waited two stinking days...

I did get the floor I wanted, so I can't gripe too much, I guess...since it was 89 freaking cents a square foot and no interest till 2010. That gives us several months to pay it off without penalty of any kind. And that's HUGE.

2. Backyard plans are running full bore right now. I've started some tomato seeds and broccoli seeds, and have a whole slew of other vegetables waiting in the wings to be planted in the new garden that I'm working on constructing (currently in my brain, very soon in the yard). I'm going to have to get three cubic yards of dirt/compost/peat moss/manure/whatever to raise the bed up high enough in the back that floods to avoid future floods. So this garden will have the dual purpose of being a garden and taking care of part of the flooding problem. So I hope anyway.

The veggies I have in my possession (and should have room for, I hope -- I probably won't plant a forest of each of these, just a couple of each...I don't need 200 tomatoes) are: cherry tomatoes, big boy tomatoes, broccoli, asparagus, garlic, green beans, carrots and beets. I'd like to get a pepper plant as well, and maybe some rosemary.

Today, I knocked down the "walls" of the little shelter that the hot tub is under...40 pickets of a fence. Fortunately, they were nailed to the rails, so I just hammered the hell out of them to break them free. Several of the pickets are in fantastic shape still and will be used in this garden, either as backup support around the beds or as walkway planks or something. We'll see for sure. It was definitely hard work, but I wanted to get it done because the garbage men come tomorrow, and there were some unsalvageables that I had to toss.

As you can see from the pictures on Flickr (click on the photo here), the yard looks significantly different with the walls of the shelter down. You can also see that I tried to pry the roof off, piece by piece. But, after climbing up the ladder and working for about 15 minutes plus to get that one panel off, I realized that it was going to work, and that, oh, these appear to be some sort of fiberglass panels, and my forearm itches and hurts like hell. I got a ton of fiberglass fibers rubbing on the underside of my forearm because I rested it briefly on the panel to try to pry it up. Live and learn, I guess.

So, tomorrow is supposed to be another unbelievably spectacularly beautiful day here in Chicago. I took the day off today, and will have most of tomorrow off, so I think that I will do some more work out there. Maybe I'll go buy the 70 or so bags of topsoil and stuff...but that would mean I'd have to rent one of those menards or home depot trucks...anyone done that and had good/bad experiences? (Anyone still reading at this stage?)

Anyway, we shall see how it goes tomorrow. I'm pretty tired from today's adventures...more soon, I promise!

Tuesday, March 17, 2009

Stay on target...stay on target...

It's been a quiet week and a half here at the bungalow...and that's OK. We've just had too much going on. But I haven't lost track of things that need to be done. It's been brainstorming time, and here at the house, we've been brainstorming ways to solve the backyard flooding issue, brainstorming ways to get the painting and flooring done in the basement family room, and brainstorming ways to feel a heckuva lot better about the sewer main situation.

I've also been getting the gardening itch. Ever...so...slightly.

The good news is, I visited Menards and Home Depot today, and definitely found the laminate floor I want. Let's hope they still have it in stock tomorrow, when we'll probably go back to get it. It's EXACTLY what I want, on sale and everything. Plus, the no interest until 2010 is a big, big plus right now!

Also, at Home Depot, I took a gander at primer and paint colors, and I actually think I might have found some colors that I really like that seem to go together and may very well go with what we plan to move down there too! It's Behr paint though...any reviews from any of my regular readers out there? Have you had any problems with Behr? Gina and I, since moving in together, have used exclusively Benjamin Moore. But I've not been all that impressed, specifically, for the price. I mean, it's been fine, don't get me wrong...but it's not like it's been so above and beyond that I'm dying to use it over anything else.

So, I'd love to hear your thoughts on Behr paint. I'm looking at a darker color on the bottom half and a neutral on the top half.

Thursday, March 5, 2009

Words are very, unnecessary...

The title is taken from "Enjoy the Silence" by Depeche Mode...and that's what I've been doing, at least in the realm of home improvement, for the moment.

A.J.'s first birthday party went very well. We had loads and loads of people, and when he wasn't overwhelmed, A.J. had a very good time. Thanks to everyone who came out, brought gifts or themselves and joined us for our son's big day!

The basement family room walls and ceiling got done, as did the electrical work. We cleaned the floor about 3-4 times and got it decent enough. The fireplace works and definitely warms it up down there, and overall, it's just a nicer room to be in.

We still have plenty of post-party cleaning to do (the garbage men don't come until tomorrow, and there's full trash bags all over that need to be shed). But we're getting there. Work is kicking me in the ass right now; but at least I'll get back to it soon enough. I now have motivation, and something I didn't have before the party: TIME. :)

Monday, February 23, 2009

If you've never seen our HGTV episode...

Then, by all means, you should set your TiVo, DVR or old-fashioned VCR to tape it...unless you're home on Wednesday at 1:30 Eastern time...

http://www.hgtv.com/designed-to-sell/an-aging-condo-gets-a-facelift/index.html

Enjoy! It's from the days prior to our bungalow ownership (obviously), when we lived in a condo a few miles east of here, in Old Irving Park. It was a great condo...but we needed MORE! :)

Oh yeah, and the final drywall mud coat is finished tonight...sanding on Wednesday!

Tuesday, January 27, 2009

After careful consideration and some number-crunching...

Well, I ran the numbers yesterday, and pored over what we could and could not do. Barring the electrician walking in and saying that his work would cost us a billion dollars, we should be able to squeak by and get the family room in presentably decent-looking shape for this party.

So I just went to the ol' HD and placed a large lumber order, for a load of studs, top plates, bottom plates (pressure-treated), insulation and plastic sheeting. It will be delivered on Saturday, and my cousin-in-law will begin work on it Sunday (prior to the Super Bowl). Thankfully, because of those beautiful Chase Rewards points, almost half of the total cost was covered by gift cards, which I had redeemed the points for about a month ago in anticipation of this. Of course, though, with work starting Sunday, that means I'll have to stop and get a few cases of beer too (the "unbudgeted" cost of this remodel!) on Saturday, since I'm traveling tomorrow through Friday for work.

It may take a little finagling of finances, and creative use of sales, promotions and "no interest till..." credit card use, but I think we'll be able to get the basics taken care of before the party. And that's good. That's the goal. After the party, though, things will go "on hold" until things lighten up around here.

I can't say we've "survived the scare" if you want to call it that, because it's in no way close to over, economically speaking. But, barring any insanity in the near term, we should be able to do what we hoped, which was have the walls and ceiling done by the party at the end of February.

Let's cross our fingers!

Tuesday, January 13, 2009

Moving right along...

On to the basement!

My cousin-in-law, a carpenter, came by this past weekend to talk family room renovation. Our deadline is Feb. 28, which is my son's first birthday party. We want to invite folks over, and thus need a ceiling and walls drywalled, sanded, painted. So, we need to finish demo (which my brothers helped tremendously to make a huge dent in on Sunday), bleach up the walls to clean them (tiny bit of mold splotches here and there), and then, most importantly, get a drainage system/sump installed.

We had some seepage in the super-fast thaw and rainstorm last month. So, we'll need to get some cracks patched too. And this spring, I'll have to solidify and rework a few of the downspouts, no doubt.

So Thursday, I've got two companies coming out to give me estimates. The third one I called, unfortunately, can't even visit for an estimate until Feb. 4, which simply wouldn't give enough time, I don't think, to get all the electrical, framing, drywalling and such done. So, I'm hoping this won't be a brutal, terrible cost. Until this seepage started happening last year, I was willing to roll the dice (stupidly) and not get this system installed, so, in a sense, this is an unexpected expense.

On the flip side, a drain tile setup will allow us to install a floating engineered hardwood floor as originally hoped, rather than a stone tile floor. I would be OK with either, honestly, but I like the wood floor look (sound and feel) better.

I'm also curious to see what they say when I tell them that the back half of the basement is finished, and as such, inaccessible for a drain tile installation...don't know if they can do it in one room only, or if it's ineffective or what. But I guess I'll see soon enough...

I'm also also also very curious to see what the electrician says when he sees our mess of an electrical box. That could cause an unforeseen expense too, if he says, "Holy crap...I'm going to have to just redo this whole box." He's a friend of the family too, so I can trust he won't just be saying that to make money off me. :)

And hopefully, things will go OK otherwise. Hopefully!

Monday, January 5, 2009

Either a breakthrough or impending doom...

So, Friday, my wife's cousin is coming over to talk basement family room with me. What can be done, what can he do, how much, etc.?

I recently invested in the stock market, and one of the interesting things I read, on occasion, is the reports on which companies are going to announce earnings statements in the coming period of time, and whether they predict good or bad news. I kind of feel this way about my basement right now. So, I'm selling stock in my basement...it's an IPO. Who wants in? It'll cost you about $25 a share... ;)

Anyway, I'd do it all myself, but I need some professional help, and nothing like a professional I know and trust and am half-related to now. :) The kicker is, we're having our son's first birthday party Feb. 28, and we plan to invite a decent amount of folks. So we need the basement...the entire basement, not the cordoned-off half-basement/dungeon that I created for our Halloween party. For the Halloween party, demolished walls were OK. Not so for a first birthday party.

We have several issues that need to be sorted out before walls can go up...
1. demo-ing the current furring-strip framework and odd pegboard baseboards.
2. plugging and filling the cracks in the foundation, which are not leaking and don't appear to ever have leaked, but could someday.
3. figuring out how to solve the serious seepage issue in the cold-storage room under the front porch, which then spills into the family room on its way to the drain.
4. figuring out how/when to get my other cousin in to install the fireplace.
5. figuring out how/who to get for the electrical work, whether we're talking outlets or lights.
6. getting the cable guy to come in prior to drywalling to run cable to the new TV area.
7. and, how could I forget: figuring out what this all is going to cost and how we're gonna pay for it without sucking up every inch of our life savings.

It should be a lot of fun! I certainly can't wait.

Saturday, December 27, 2008

I'm in pieces, bits and pieces...

Yesterday, I renewed my library card, finally. :)

That gave me access to several things online...and I was able to find a couple interesting things about the house AND about my family and the house I grew up in...

1. I found a 1948 Chicago Tribune story about graduating high school seniors at the local public high schools who were to be some sort of award-winners, as voted on by their classmates. A girl named Patricia Morrison, who attended Steinmetz, came up as living at our current address here in Portage Park (as the story listed the addresses of the kids up for this honor as well as their high school). So that's a lead, definitely.

2. I got onto the Cook County Records page and was able to find a few things out about the owners of our house just prior to us. Apparently, Ronald Schabinger (the softball Hall-of-Fame member who lived here just prior to us but died about six months before we bought the house) had this house for quite a while. Or at least, a family member of his did. There were three different members of the Schabinger family listed in the records at different times going back to 1987. In 1987, the Timko family appears to have owned the house. But that's as much as I got. Still, again, a good lead.

3. As believed, the Sanborn fire insurance map showed that the back porch of the house once was a separate porch with a side entrance (where our current stove/oven sits), much like the "typical" Chicago-style bungalows out there. However, what is further interesting from the Sanborn maps is the fact that our house apparently had NOT BEEN BUILT in 1924, when the map for this area was first drawn. In fact, the second house in from the corner was on a three-wide city lot, including our lot AND the corner lot. What intrigues me about this is, there had been confusion to begin with over whether this place was built in 1922 or 1924. What also intrigues me is that the second house in from the corner (our neighbor's house) looks like it's more of a twin that would have been built around the same time as our place. Maybe not. Anyway, this will lead to more investigation.

4. The other interesting stuff I saw was mostly related to the house I grew up in...it was apparently one of the first built on its block on the Southwest Side, because it's surrounded by empty lots in the Sanborn map for its block, and things like that.

Anyway, today I've been spending most of the day fighting the backyard floodwaters again, trying to keep them at bay and from coming in the house. Went to Home Depot and got the last pump they had, and so far, it's been great. Maybe I'll post a review at some point!

Friday, December 26, 2008

Looking for Ikea Trofast reviews/alternatives...

Hey, wonderful, glorious readers of Build a Better Bungalow (and wherever else this might end up...Google? Houseblogs.net?)...

I need some help. Going into Christmas, we knew our son would get tons of toys for his first Christmas...we knew it. But we didn't have a toy box or toy "storage." Well, he did, and now we have to make our move!

I don't want just some old toy box, even though a traditional box would be, well, traditional. I want a storage unit that will allow sorting of the toys and will prevent little pieces from falling to the bottom and being forgotten or lost. I also want something that can change as he gets older and will give us some versatility. As such, Ikea's Trofast system came to mind. Here's a picture and a link:
So, aside from the Ikea Web site really, honestly sucking, and my general derision toward the thought that I would buy anything at Ikea (I don't like the quality I've seen on many things I've browsed or that my wife has owned from them, and typically I'm not attracted to their styles of furniture), this does actually seem like it would be a solid purchase to make.

My question is, has anyone out there used this system at all? Any positives? Negatives? Any better options out there at other stores that might cost less but provide more or equal to Ikea?

My wife and I traveled all the way to the Ikea in Schaumburg today, but couldn't find this particular combination or figure out how to get it. And, after dealing with a stupidly laid out store (again, my humble opinion, but I shouldn't have to lug my 9-month-old son in the doors, up an escalator and halfway across the 2nd floor to get a shopping cart -- he's not a feather, you know), invisible employees and other headaches, I decided to leave and see about getting it online. Of course, I got back here and checked, and I can't order this specific combination online...so I wasn't happy about that.

So, I'm actually hoping someone else will give me a better store/better option than Ikea! Comment away!

Wednesday, December 10, 2008

House history: It's contagious...

Spurred on by The Bungalow Chronicles and Bungalow Insanity, I decided to scratch the House History itch this evening...using their methods of checking the 1930 Census data, I found out about a previous owner of our house -- the Stoffer family. Julius P. and Margaret Stoffer were of Romanian descent, and came to the U.S. sometime between 1913 and 1921 -- I know this because they had a 17-year-old daughter (Elizabeth) who was also born in Romania, and a 9-year-old son (Martin) who was born in Illinois.

Julius was a bricklayer in building construction, according to the census data -- his neighbor to the east was a Romanian cement finisher in building construction as well. I wonder if they worked together and/or built these houses? Of course, I believe our house was built about 8 years prior to the census, so anyone could have built these homes and lived in them prior to the Stoffers. That said, the "cement finisher's house" and mine are extremely similar, so who knows?

Elizabeth, it appears, worked as a bookkeeper for a furniture moving company, for what it's worth, at age 17.

So now I'm curious about all this...I wish I had the time to research more. I did confirm that the previous owner died about six months before we bought the house, and was relatively young (50 years old). I do know more about him though, having done research and asking neighbors about him before, when we first moved in.

But I'm excited -- yet, finding out more, I fear, will require a trip to the Harold Washington Library downtown, and would probably require a day or two for it all too. That excites and scares the hell out of me, mostly because I wish I knew where to start first, rather than wasting time figuring out what to do. You know?

I did spend a lot more time today on Ancestry.com researching my family tree, rather than my house's previous owners (I hardly know any, so that's why). It's a really cool tool for that, if any of you are into genealogy of your families.

Anyway, if I figure out anything else, I'll record it here, of course.

Friday, July 4, 2008

Months of thought, hours of "doodling"...

...but I think I finally, FINALLY, have devised what I want my basement ceiling to look like, at least in the main area. See the pictures added here to get the idea for the rough draft, drawn up in Sketchup (sorry for the sloppiness -- there are some rogue lines and planes floating around!


(EDITED, ADDED LATE JULY 4): Here are my thoughts on this whole basement ceiling thing.

1. I tore down drywall, so I didn't want to put up drywall again, since nothing was really wrong with what I tore down.
2. To the bottom of the joists, it's about 73 inches, so a drop ceiling was out of the question. There was no way to modify it and make it look OK that I could think of, either.
3. I wanted something more "sophisticated" looking than a drop ceiling anyway.
4. Leaving the beams and such exposed and painting it was not an option either, because of the total lack of sound insulation. Also, I hate track lighting. Also, it felt like a crime to paint what appeared to be beautiful woodwork on the underside of the floor. Also, the joists were in pretty decent shape, and it just wasn't for me.
5. Leaving the ceiling exposed created the difficult conundrum of what to do at the wall-ceiling corner. Examples I saw of this were not up to my liking, and I couldn't think of anything better.
6. The more I saw boxed beam ceilings, the more I thought that would look great in our family room downstairs and could be exactly up my alley.


So this is what I came up with when I finally sat down with all the ideas bouncing around in my head. It's actually a raised "drop" ceiling, in a sense.


I will buy nice flat trim wood to cover the bottoms of the joists. They will protrude just outside of the joist widths to create a mini (like, less than an inch) "shelf" above which I'll fasten some crown molding the entire length of the joists. On top of those joists, I will rest the acoustical panels that are typically used for drop ceilings.


As you can see in the cross-section version, there will be a gap above the panels, allowing me to tilt them up and pull them out. This way, if I ever DO need access, I'll have it. Furthermore, the acoustic tiles are probably lighter than drywall, so the weight load will be better on the crown molding/trim. I'm aware I'll have to cut the panels smaller to fit, but that's easier than cutting drywall, and they don't have to be perfect, just so long as they clear the edges of the moldings on each side.


Lighting: This is the tricky part. I know that I'm going to have a few fluorescents here. In the sketchup model below, in the righthand part between the joists, you can see my plan. It's going to be inset fluorescent lighting, with the housing separated out by a couple 2x6s (or so) that will run 90 degrees to the joists on each side...the molding will be parallel with the regular molding and I will hide a fluorescent bulb on each side behind it, bouncing the light off the ceiling and to the floor. I also plan to have small can lights throughout the room, assuming there's enough "headspace" for them above the ceiling panels.


Since I haven't officially measured this, it's probably not an exact representation, and the final version may differ. But at least I got these ideas into a working drawing that I can manipulate now.


Problems this doesn't solve, however, are workload (lots of cutting, staining, fastening, etc.), what, exactly, to do at the wall-ceiling corner to minimize drywall cutting and such, and how to maximize sound insulation. I know the acoustic panels are OK, but will they be enough, I wonder? I guess we'll see!


Have a happy Fourth of July!

Saturday, May 24, 2008

All quiet on the home front...

Well, traveling's done, and this weekend, family obligations have pretty much taken over. But, I have done some planning for the front garden, so we'll see what and when that happens. But at least I'll always know I have a plan for this spot:
This is where I want to put my rain garden, much like what the HCBA did at the North Side Model Bungalow they renovated last year...though different. But same theory. Below is my plan. I searched long and hard for just the right centerpiece for the background of this garden and finally found it in my friends' garden in Grayslake. It's Sutherland Gold Elderberry...it's so beautiful, and it will play perfectly against our dark brown brick and the shaded gangway area between my house and my neighbor's. I'm really happy about it. Now I just have to find it somewhere (then chop down the evergreen "tree" that is currently there) and get crackin' on making this garden. Here's my not-so-rough-anymore plan below. Again, for this I used Floorplanner.com for the initial dimension-based stuff, then exported a photo and worked on placement of "my" plants in Photoshop.

I should follow this up with, we still have the fence to do in the backyard before I can really dig into this project up front. Pun intended.

Sunday, May 18, 2008

Legs like jelly...

What a busy weekend! Unfortunately, little was done in and around the house. My little bro graduated with his Master's degree Saturday, so we drove out to the boondocks to have a family celebratory dinner. That was fun, but it pretty much shot Saturday in the foot.

Today was also shot mostly in the foot, in that, I decided it was high time to get back on the bike and do what I once did semi-regularly for a couple years back in high school and college. And that is ride my bike on long, organized event-type rides.

Today, I rode 25 miles on my new bike in the Prairie Pedal event up in Grayslake, Ill., sponsored by the Liberty Prairie Conservatory. My friends live up there in the "subdivision" that hosts the event, and it was really nice. Obviously, though, my legs and rear-end are not used to all that work. It was chilly, but nice bike-riding weather, except for the ever-present wind, of course.

I was happy with how I rode -- I rarely felt truly winded, which made me feel really good. My legs just didn't have the stamina in them to keep up the pace beyond the 25 miles we did.

Of course, my friends are big-time gardeners in the same mold as me -- buy something, preferably native, regional or perennial, stick it in the ground and see what happens. So, we went to a couple of Lake County's finest garden centers. I was impressed, more or less...though they didn't have a ton of what I was looking for (which I didn't even know what I was "looking for" either anyway), I came away with some good ideas. And, my friends gave me a FANTASTIC idea for one of my tall shrubs out front. Now, if I can just find it to buy it, we'll be good to go!

Hope all your weekends went well...

Monday, April 14, 2008

Everyone swears by freecycle...but I don't get it...

Maybe I'm a moron. Maybe I'm just unlucky or something. But, this is my second go-around on Freecycle, and let me tell you, I'm really, honestly not impressed at all.

Maybe it's because I'm in a big city (Chicago), or maybe I'm not looking at it the right way or something, but to me, all that appears to be offered is a whole bunch of useless junk (at least to me). I've not seen anything, thus far, that I'd have even a close interest in. Furthermore, a lot of the stuff, it's like, "Maybe I need that, but am I really going to call my brother to accompany me to go pick the thing up, waste my evening and his, for something as miniscule as that?" Further, there's just SOOOOOO much junk to weed through. It's like attempting to find a needle in a haystack, and really, I just have a hard time committing to doing something like that.

I understand the "penny saved, penny earned" idea behind it. I get that, totally. And I'm far from the person who needs to have everything new and fresh and, even, hip. I grew up wearing hand-me-downs and that was fine. But I just don't get it. I'll probably stay on there, only because, well, you can disable getting daily emails now. Occasionally, maybe I'll stumble on over and stumble upon something I want. But, really, I don't have high hopes.

Maybe all you freecycle vets can tell me what I'm doing wrong. WITHOUT being preachy about it being right and good and all that. ;)

In other news, I calculated out the cost for replacing the whole fence. All 200 feet of fence (believe it or not, we have that much fence around our city lot). It's going to be cost-prohibitive. So, despite two posts ago saying I think we'll replace the whole thing, that probably ain't happening. The one side is likely to get done, and that's about it. In and of itself, that should be a blast, let me tell you!